Brentwood Recycling Systems is proud to represent GICOM in Australia, New Zealand and South East Asia.
Composting period | 5-7 days |
Dry matter content | 80-85% |
Mass reduction | 35% |
No pathogens | |
Odour free |
The MSW is screened at 70 mm and brought into the tunnel without the need to improve the structure. The handling takes place automatically and as an alternative, it can be done with a loader. There are 3 possible goals:
Retention time in tunnel depends on the set goal.
Composting period | 7-14 days |
Dry matter content sludge | 18-25% |
Dry matter content compost | 60% |
Overall mass reduction composting | 85% |
Organic matter reduction | 60% |
No pathogens |
The sludge is mixed with f.e woodchips, sawdust and freshmade compost to improve the structure. The handling of the sludge mixture is done automatically, as an alternative it can be done with a frontend loader. The compost can be used for agricultural purposes and landscaping or as a daily and/or top cover on landfills.
Composting period | 5-7 days |
Dry matter content | 80-90% |
No pathogens | |
Odour free |
On a daily basis the manure is transported into the tunnel where the composting process takes place. Depending on the type and the composition of the manure, one can add a processing step to the process (for example mixing).
The exhaust air coming from the process needs to be cleaned with a (chemical) scrubber and a biofilter.